We design, manufacture and install mass timber projects — including hotels, resorts and private modular houses — with high-performance engineering and quality.
Mass timber replaces concrete and steel with engineered wood: Cross Laminated Timber (CLT) for walls, floors and roofs; Glue Laminated Timber (GLT/Glulam) for beams and columns. The result is faster construction, lower embodied carbon and warm, beautiful architecture.

Engineered structural wall, floor & roof panels
Engineered structural beams & columns
ASTM / BS / EI building standards
NFPA regulations & applicable fire codes
Reducing carbon emissions, cutting on-site time, lowering costs, and delivering high-quality outcomes through precision off-site manufacturing.
Of construction completed under factory-controlled QA/QC
Faster on-site erection vs conventional RC construction
CLT panel thickness range, engineered per structural design
Renewable timber sourcing for reduced embodied carbon
GR Engineering, in partnership with its mass timber venture partners, offers a growing portfolio of solid timber modular house designs built on Cross Laminated Timber (CLT) and Glue Laminated Timber (GLT/Glulam) technology — for private houses, farmhouses, resort villas and boutique hotel modules.
| Parameter | Specification |
|---|---|
| Structural System | Cross Laminated Timber (CLT) walls, floors & roof; Glue Laminated Timber (GLT) beams & columns |
| Typical Panel Thickness | 94 mm – 300 mm (CLT), engineered per structural design |
| Design Standards | ASTM / BS / EI Building Standards |
| Fire Rating Compliance | NFPA regulations; applicable American & European fire and safety codes |
| Factory Prefabrication | Up to 85–90% of construction completed under factory-controlled QA/QC |
| Typical On-Site Erection Time | Reduced by up to 55% compared to conventional RC construction (indicative) |
| Sustainability | Renewable timber sourcing; significantly reduced embodied carbon vs conventional construction |
| Typical Applications | Private modular houses, farmhouses, resort villas, boutique hotel modules |
Panels and modules arrive engineered and finished — erection takes weeks, not months, with minimal site disruption.
Renewable timber locks in carbon rather than emitting it — dramatically reducing a building's embodied footprint.
Factory-controlled QA/QC delivers millimetre precision no site-poured structure can match.
Off-site manufacturing compresses programme risk and keeps budgets predictable.
Designed to NFPA regulations and applicable American & European fire and safety codes.
Exposed timber creates warm, biophilic interiors that guests and residents love.